Fifth Meeting

From Kolflow Project

(Difference between revisions)
Jump to: navigation, search
(Thurday 21 :)
 
(8 intermediate revisions not shown)
Line 1: Line 1:
{{Meeting
{{Meeting
-
| name=Kick-off meeting
+
| name=non-Kick-off meeting (the project has already been kicked off)
| startdate=2013-03-21T09:30:00
| startdate=2013-03-21T09:30:00
| enddate=2013-03-22T15:30:00
| enddate=2013-03-22T15:30:00
Line 6: Line 6:
| location=LINA
| location=LINA
}}
}}
 +
 +
Attending:
 +
Pascal Molli, Emmanuel Nauer, Alice Hermann, Jean Lieber, My Thao, Yannick Toussaint, Pierre Antoine Chapin, Marie Lefèvre, Hala Skaf, Luis Ibanez
== Locations ==
== Locations ==
Line 35: Line 38:
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::!Task1]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::!Task1]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline
Line 51: Line 54:
*# Discussion on status of deliverables:  
*# Discussion on status of deliverables:  
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::Task6]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::Task6]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline
Line 61: Line 64:
|format=table
|format=table
}}
}}
-
 
-
* [[Media:SilexAssistance.pdf|Assistance]], [[User:Marie.Lefevre|Marie Lefevre]]
 
-
 
* '''12:30-14:30''' Lunch  
* '''12:30-14:30''' Lunch  
Line 71: Line 71:
# Discussion on status of deliverables:  
# Discussion on status of deliverables:  
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::Task4]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::Task4]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline
Line 90: Line 90:
*# Discussion on status of deliverables:  
*# Discussion on status of deliverables:  
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::Task5]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::Task5]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline
Line 101: Line 101:
}}
}}
 +
*Presentation:
 +
** Delivrable D4.4: Test and evaluation of the alter-ego assistant with regard to the scenarios
 +
** Delivrable D6.3: Man-­machine collaboration scenarios progress report
 +
** Delivrable D5.3: Algorithms and architecture for a distributed semantic wiki and a distributed alter-­ego assistant
 +
** Paper at FLAIRS 2013
 +
** Perspectives
 +
** kTBS & SemWiki
-
* '''20h00''' Dinner  
+
* '''19h30''' Dinner "Lieu Unique", http://fr.wikipedia.org/wiki/Le_Lieu_unique
=== Friday 22  ===
=== Friday 22  ===
Line 114: Line 121:
* '''10:30-11:30''' [[Task3]] {{#ask: [[Task3]] | ?Task_title= | format=list}}, '''{{#ask: [[Task3]] | ?Task_responsible= | ?Task_activities= | format=list}}
* '''10:30-11:30''' [[Task3]] {{#ask: [[Task3]] | ?Task_title= | format=list}}, '''{{#ask: [[Task3]] | ?Task_responsible= | ?Task_activities= | format=list}}
-
*# Discussion on status of deliverables:  
+
*# Discussion on status of deliverables (maximum : 15 minutes) :
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::Task3]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::Task3]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline
Line 126: Line 133:
|format=table
|format=table
}}
}}
 +
 +
* What I have done, what I am currently doing, what I will do, by Alice Hermann (30 minutes)
 +
 +
* Revisor: a box full of revision operators, by Jean Lieber (15 minutes)
Line 132: Line 143:
*# Discussion on status of deliverables:  
*# Discussion on status of deliverables:  
{{#ask:
{{#ask:
-
[[Category:Deliverable]] [[Deliverable task::Task2||Task21||Task22||Task23]] [[Deliverable deadline::>15]][[Deliverable deadline::<25]]
+
[[Category:Deliverable]] [[Deliverable task::Task2||Task21||Task22||Task23]] [[Deliverable deadline::>15]][[Deliverable deadline::<36]]
|mainlabel=Id
|mainlabel=Id
|?Deliverable deadline= deadline
|?Deliverable deadline= deadline

Latest revision as of 20:34, 20 March 2013

Contents

Meeting description

Name : non-Kick-off meeting (the project has already been kicked off)

Description :

Start Date : 2013-03-21T09:30:00

End Date : 2013-03-22T15:30:00

Laboratory : LINA

Location : LINA



General information

Slides and talks can be made either in French or in English

Attending: Pascal Molli, Emmanuel Nauer, Alice Hermann, Jean Lieber, My Thao, Yannick Toussaint, Pierre Antoine Chapin, Marie Lefèvre, Hala Skaf, Luis Ibanez

Locations

  • Meeting Address : UFR Faculté des sciences,2 Chemin Houssinière, 44300 Nantes plan d'accès. The Meeting rooms is 105 inside LINA.

En venant de la gare SNCF A la gare SNCF de Nantes, prendre la sortie Nord. Prendre la ligne de tramway N° 1 direction François Mitterand jusqu’à l’arrêt Commerce (2 stations), puis la ligne de tramway N°2 direction Orvault Grand Val et descendre à la station Michelet Sciences.

  • The Kickoff lunches are located on campus at 5mn Walk from meeting rooms

Detailed Schedule

Thurday 21 :

  • 9:00-10:00 Task1 Coordination, GDD (Project coordination)
Id deadline task number title delivered
D43 1515 Task4 4.3 Algorithm to provide performance and errors indicators 1true
D23 1818 Task23 2.3 Specification of a continuous knowledge extraction system 1true
D44 1818 Task4 4.4 Test and evaluation of the alter ego assistant with regard to the scenarios 1true
D53 1818 Task5 5.3 Algorithms and architecture for a distributed semantic wiki and a distributed alter-ego assistant 1true
D45 2020 Task4 4.5 Algorithm to explain ontology-based processing 1true
D32 2424 Task3 3.2 prototype and tests of the interactive semantic inconsistency managing system 1true
D63 2424 Task6 6.3 Man-machine collaboration scenarios progress report 1true
D46 2626 Task4 4.6 Algorithm to suggest queries and changes to queries 1true
D54 2828 Task5 5.4 Algorithm to distribute query-solving 1true
D55 3434 Task5 5.5 Algorithm to explain and document the distributed solving, Process language and machine for man-machine coordination 1true
D25 3636 Task23 2.5 Continuous extraction, edition and annotation in a semantic wiki ; report advances on this task at the end of the project. 1true
D24 3636 Task24 2.4 Dynamic semantic annotation in a semantic wiki: definitions and specifications 1true
D33 3636 Task3 3.3 prototype of the extension integrating management of ”human-machine” and ”logical” inconsistencies 1true
D56 3636 Task5 5.6 Algorithm adapted to conflict detection
D57 3636 Task5 5.7 Test and evaluation according to the project scenarios 1true
D64 3636 Task6 6.4 Man-machine collaboration scenarios progress report 1true


  • 10:00-10:30 Coffee Break
  • 10:30-12:30 Task6 Scenarios and Evaluations, GDD (project evaluation)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D63 2424 Task6 6.3 Man-machine collaboration scenarios progress report 1true
D64 3636 Task6 6.4 Man-machine collaboration scenarios progress report 1true


  • 12:30-14:30 Lunch
  • 14:30-16:00 Task4 Traces and explanations: documenting inferences, query solving and interactions, Wimmics (Design and experiment tracing and explanation approaches)
  1. Discussion on status of deliverables:
Id deadline task number title delivered
D43 1515 Task4 4.3 Algorithm to provide performance and errors indicators 1true
D44 1818 Task4 4.4 Test and evaluation of the alter ego assistant with regard to the scenarios 1true
D45 2020 Task4 4.5 Algorithm to explain ontology-based processing 1true
D46 2626 Task4 4.6 Algorithm to suggest queries and changes to queries 1true


  • 16:00-16:30 Coffee Break


  • 16:30-18:30 Task5 Social semantic space, Silex (Design and experiment of a social semantic space)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D53 1818 Task5 5.3 Algorithms and architecture for a distributed semantic wiki and a distributed alter-ego assistant 1true
D54 2828 Task5 5.4 Algorithm to distribute query-solving 1true
D55 3434 Task5 5.5 Algorithm to explain and document the distributed solving, Process language and machine for man-machine coordination 1true
D57 3636 Task5 5.7 Test and evaluation according to the project scenarios 1true
D56 3636 Task5 5.6 Algorithm adapted to conflict detection


  • Presentation:
    • Delivrable D4.4: Test and evaluation of the alter-ego assistant with regard to the scenarios
    • Delivrable D6.3: Man-­machine collaboration scenarios progress report
    • Delivrable D5.3: Algorithms and architecture for a distributed semantic wiki and a distributed alter-­ego assistant
    • Paper at FLAIRS 2013
    • Perspectives
    • kTBS & SemWiki

Friday 22

  • 9:00-10:00

Discussions

  • 10:00-10:30 Coffee Break


  • 10:30-11:30 Task3 Inferences and Interactions for dealing with Semantic Inconsistencies, Orpailleur (Design and experiment strategies for dealing with Semantic Inconsistencies)
    1. Discussion on status of deliverables (maximum : 15 minutes) :
Id deadline task number title delivered
D32 2424 Task3 3.2 prototype and tests of the interactive semantic inconsistency managing system 1true
D33 3636 Task3 3.3 prototype of the extension integrating management of ”human-machine” and ”logical” inconsistencies 1true


  • What I have done, what I am currently doing, what I will do, by Alice Hermann (30 minutes)
  • Revisor: a box full of revision operators, by Jean Lieber (15 minutes)


  • 11:30-12:30 Task2 Continuous extraction, edition, and annotation, Orpailleur (extracting knowledge units from texts using data mining)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D23 1818 Task23 2.3 Specification of a continuous knowledge extraction system 1true
D25 3636 Task23 2.5 Continuous extraction, edition and annotation in a semantic wiki ; report advances on this task at the end of the project. 1true


  • 12:30-14:30 Lunch
  • 14:30-15:30 Discussion
  • 15:30 Coffee Break & End of the day
     
This page was last modified on 20 March 2013, at 20:34. This page has been accessed 10,680 times.