Fifth Meeting

From Kolflow Project

(Difference between revisions)
Jump to: navigation, search
(Thurday 21 :)
Line 33: Line 33:
* '''9:00-10:00''' [[Task1]] {{#ask: [[Task1]] | ?Task_title= | format=list}}, '''{{#ask: [[Task1]] | ?Task_responsible= | ?Task_activities= | format=list}}'''
* '''9:00-10:00''' [[Task1]] {{#ask: [[Task1]] | ?Task_title= | format=list}}, '''{{#ask: [[Task1]] | ?Task_responsible= | ?Task_activities= | format=list}}'''
-
 
-
** [[Media:KolflowRevue.pdf|Kolflow review 2012]], [[User:molli|Pascal Molli]]
 
-
** [[Media:KolflowArchi.pdf|Kolflow global view]], [[User:molli|Pascal Molli]]
 
-
 
-
** Debrief of Kolflow Evaluation and actions to consider
 
-
** Workshop SWCS2013@WWW2013 to submit to ESWC2013 montpellier
 
-
** Short Paper accepted at WI2012 : Improving Wikipedia with DBpedia, Diego Torres, Pascal Molli, Hala Skaf-Molli and Alicia Diaz.
 
{{#ask:
{{#ask:

Revision as of 19:57, 11 March 2013

Contents

Meeting description

Name : Kick-off meeting

Description :

Start Date : 2013-03-21T09:30:00

End Date : 2013-03-22T15:30:00

Laboratory : LINA

Location : LINA



General information

Slides and talks can be made either in French or in English

Locations

  • Meeting Address : UFR Faculté des sciences,2 Chemin Houssinière, 44300 Nantes plan d'accès. The Meeting rooms is 105 inside LINA.

En venant de la gare SNCF A la gare SNCF de Nantes, prendre la sortie Nord. Prendre la ligne de tramway N° 1 direction François Mitterand jusqu’à l’arrêt Commerce (2 stations), puis la ligne de tramway N°2 direction Orvault Grand Val et descendre à la station Michelet Sciences.

  • The Kickoff lunches are located on campus at 5mn Walk from meeting rooms

Detailed Schedule

Thurday 21 :

  • 9:00-10:00 Task1 Coordination, GDD (Project coordination)
Id deadline task number title delivered
D43 1515 Task4 4.3 Algorithm to provide performance and errors indicators 1true
D23 1818 Task23 2.3 Specification of a continuous knowledge extraction system 1true
D44 1818 Task4 4.4 Test and evaluation of the alter ego assistant with regard to the scenarios 1true
D53 1818 Task5 5.3 Algorithms and architecture for a distributed semantic wiki and a distributed alter-ego assistant 1true
D45 2020 Task4 4.5 Algorithm to explain ontology-based processing 1true
D32 2424 Task3 3.2 prototype and tests of the interactive semantic inconsistency managing system 1true
D63 2424 Task6 6.3 Man-machine collaboration scenarios progress report 1true


  • 10:00-10:30 Coffee Break
  • 10:30-12:30 Task6 Scenarios and Evaluations, GDD (project evaluation)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D63 2424 Task6 6.3 Man-machine collaboration scenarios progress report 1true



  • 12:30-14:30 Lunch
  • 14:30-16:00 Task4 Traces and explanations: documenting inferences, query solving and interactions, Wimmics (Design and experiment tracing and explanation approaches)
  1. Discussion on status of deliverables:
Id deadline task number title delivered
D43 1515 Task4 4.3 Algorithm to provide performance and errors indicators 1true
D44 1818 Task4 4.4 Test and evaluation of the alter ego assistant with regard to the scenarios 1true
D45 2020 Task4 4.5 Algorithm to explain ontology-based processing 1true



  • 16:00-16:30 Coffee Break


  • 16:30-18:30 Task5 Social semantic space, Silex (Design and experiment of a social semantic space)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D53 1818 Task5 5.3 Algorithms and architecture for a distributed semantic wiki and a distributed alter-ego assistant 1true




  • 20h00 Dinner : "La cuisine", 1, boulevard Lobau, Nancy ([1])

En tram : prendre la ligne 1, direction Essey Mouzimpré et descendre à l'arrêt " Division de Fer ". Prendre la rue du tapis vert (qui n'est pas loin de l'arrêt...). Le restaurant se trouve au-delà du bout de cette rue.

Friday 22

  • 9:00-10:00

Discussions

  • 10:00-10:30 Coffee Break


  • 10:30-11:30 Task3 Inferences and Interactions for dealing with Semantic Inconsistencies, Orpailleur (Design and experiment strategies for dealing with Semantic Inconsistencies)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D32 2424 Task3 3.2 prototype and tests of the interactive semantic inconsistency managing system 1true



  • 11:30-12:30 Task2 Continuous extraction, edition, and annotation, Orpailleur (extracting knowledge units from texts using data mining)
    1. Discussion on status of deliverables:
Id deadline task number title delivered
D23 1818 Task23 2.3 Specification of a continuous knowledge extraction system 1true



  • 12:30-14:30 Lunch
  • 14:30-15:30 Discussion
  • 15:30 Coffee Break & End of the day